June 7, 2012
Dear Church Family,
I am thankful for each person who has given to our “Be A Part Of The Story” Capital Campaign. Our fellowship has given approximately $635,000 through May 2012 in support of the Capital Campaign, which began in 2009. God has blessed us with 176,000 square feet of indoor space, and significant progress has been accomplished in making needed repairs, improvements, and replacements of aging HVAC equipment. In addition to the projects which have already been completed, which are shown below, approximately $268,000 in additional capital improvements and system upgrades have been identified and will be considered as projects next in priority, with some projects needing immediate attention. Special envelopes are located in the pews which may be used to make contributions to the campaign. A listing of the 15 priorities for the 2012 Capital Campaign is also shown below.
Our church will celebrate its 130th birthday on August 12, 2012. These 130 years are an amazing story of God’s provision, grace, changed lives, and blessings! We are a family of believers representing different cultures and many backgrounds. Most importantly, we are a strong family bound together by the love of our Savior, Jesus Christ. I am excited that each ministry and all departments of our church are striving for excellence to accomplish the mission of First Baptist Snellville: Connecting People To Jesus Christ And His Story. Our fellowship has a rich history of great worship, spirit led music and praise, gifted Bible study teachers, a strong belief that the Bible is the inerrant and infallible Word of God, and a passion to win the lost to Christ. This history exists because of a fellowship which believes in the power of prayer. My family and I continue to be honored that God has placed us in such a loving and supporting body of believers. Thanks again for your part in making “Be A Part Of The Story” a success. Pictures of completed projects are shown below.
Sincerely,
Steve Foster
Senior Pastor
Funds given for 2012 Capital Campaign AS OF 05/8/13 : $216,784
Completed Chapters as of May 31, 2012
- Constructed a new sanctuary platform and orchestra pit
- Replaced 18 major HVAC systems and made several major HVAC repairs
- Purchased dining room chairs and tables
- Installed an enhanced security and closed circuit TV and camera systems
- Replaced carpet in dining hall and several classrooms
- Painted numerous areas in church buildings
- Made major roof repairs
- Repaired the detention pond
- Made a number of minor facility repairs
2012 Capital Campaign Priorities
| |
CAPITAL CAMPAIGN PROJECT |
ESTIMATED EXPENSE |
1.
|
IT Upgrades (servers, routers, backup processes, etc.
|
$ 44,000
|
2.
|
Worship Center Lighting (includes dimmer system & stage lighting)
|
$ 36,000
|
3.
|
Microphones for Worship Center
|
$ 8,000
|
4.
|
HVAC Energy Management System
|
$ 24,000
|
5.
|
Repair Cracked Concrete Sidewalks
|
$ 3,000
|
6.
|
HVAC System Repair & Replacements
|
$ 57,000
|
7.
|
Renovate Restrooms in A100
|
$ 12,000
|
8.
|
Repair and/or Replace Gutters & Downspouts
|
$ 12,000
|
9.
|
Chair & Table Replacements (for classrooms in E-Hall)
|
$ 20,000
|
10.
|
Roof Repairs (as needed)
|
$ 12,000
|
11.
|
Paint Outside Yellow Brick (to match red brick)
|
$ 7,000
|
12.
|
Playground Improvements
|
$ 12,000
|
13.
|
Carpet Replacement (for classrooms in E-Hall)
|
$ 18,000
|
14.
|
Prayer Garden / Stone Retaining Wall Improvements
|
$ 3,000
|
15.
|
Ongoing Painting (as funds are available)
|
|
|
TOTAL
|
$268,000
|
Platform in Worship Center
Replace Dining Room Chairs
Replace Dining Room Tables
Grounds Improvement
(Detention Pond Repairs)
Replace Classroom Carpet
Security/CCTV Systems
What is a CCTV? Check it out HERE
HVAC System: Building
HVAC System: Building
HVAC System: Building
HVAC System: Building
HVAC System: Building
HVAC System: Building
Painting
(Hallways, Stairwells, and Common Areas)
3rd floor a building doors & frames
3rd Floor A Building Doors & Walls
3rd Floor A Building Doors
3rd Floor A Building Entry Doors
3rd Floor A Building Doors & Frames
All Walls in Worship Center
Ceiling, Columns & Doors Grand Foyer
Ceiling, Columns & Doors Grand Foyer
E Hall Loading Dock to Grand Foyer
E Hallway
Front Columns & Doors
Front of Columns
Hallway to Brides Room
Loading Dock & Elevator Foyer
Loading Dock Door & Walls
Painting & Patching
Painting & Patching
Usher Room
Worship Center Vestibule
Worship Center Vestibule
Roof Repair
This is your opportunity to
BE A PART OF THE STORY!
CLICK TO BE A PART OF THE STORY:
|
|