Dear Church Family,

I am thankful for each person who has given to our “Be A Part Of The Story” Capital Campaign.  Our fellowship has given approximately $635,000 through May 2012 in support of the Capital Campaign, which began in 2009.  God has blessed us with 176,000 square feet of indoor space, and significant progress has been accomplished in making needed repairs, improvements, and replacements of aging HVAC equipment.  In addition to the projects which have already been completed, which are shown below, approximately $268,000 in additional capital improvements and system upgrades have been identified and will be considered as projects next in priority, with some projects needing immediate attention. Special envelopes are located in the pews which may be used to make contributions to the campaign.  A listing of the 15 priorities for the 2012 Capital Campaign is also shown below.

Our church will celebrate its 130th birthday on August 12, 2012.  These 130 years are an amazing story of God’s provision, grace, changed lives, and blessings! We are a family of believers representing different cultures and many backgrounds.  Most importantly, we are a strong family bound together by the love of our Savior, Jesus Christ. I am excited that each ministry and all departments of our church are striving for excellence to accomplish the mission of First Baptist Snellville:  Connecting People To Jesus Christ And His Story.  Our fellowship has a rich history of great worship, spirit led music and praise, gifted Bible study teachers, a strong belief that the Bible is the inerrant and infallible Word of God, and a passion to win the lost to Christ.  This history exists because of a fellowship which believes in the power of prayer.  My family and I continue to be honored that God has placed us in such a loving and supporting body of believers. Thanks again for your part in making “Be A Part Of The Story” a success.  Pictures of completed projects are shown below.

Sincerely,

Steve Foster
Senior Pastor

 

Funds given for 2012 Capital Campaign AS OF 05/8/13 : $216,784

  
 

Completed Chapters as of May 31, 2012

 

  1. Constructed a new sanctuary platform and orchestra pit
  2. Replaced 18 major HVAC systems and made several major HVAC repairs
  3. Purchased dining room chairs and tables
  4. Installed an enhanced security and closed circuit TV and camera systems
  5. Replaced carpet in dining hall and several classrooms
  6. Painted numerous areas in church buildings
  7. Made major roof repairs
  8. Repaired the detention pond
  9. Made a number of minor facility repairs

 

 

 

 

2012 Capital Campaign Priorities

 
  CAPITAL CAMPAIGN PROJECT ESTIMATED EXPENSE

1.

IT Upgrades (servers, routers, backup processes, etc.

$     44,000

2.

Worship Center Lighting (includes dimmer system & stage lighting)

$     36,000

3.

Microphones for Worship Center

$       8,000

4.

HVAC Energy Management System

$     24,000

5.

Repair Cracked Concrete Sidewalks

$       3,000

6.

HVAC System Repair & Replacements

$     57,000

7.

Renovate Restrooms in A100

$     12,000

8.

Repair and/or Replace Gutters & Downspouts

$     12,000

9.

Chair & Table Replacements (for classrooms in E-Hall)

$     20,000

10.

Roof Repairs (as needed)

$     12,000

11.

Paint Outside Yellow Brick (to match red brick)

$       7,000

12.

Playground Improvements

$     12,000

13.

Carpet Replacement (for classrooms in E-Hall)

$     18,000

14.

Prayer Garden / Stone Retaining Wall Improvements

$       3,000

15.

Ongoing Painting (as funds are available)

 

 

TOTAL

$268,000
 
 
 

  

 

 

Platform in Worship Center


 

 
 

 

 

Replace Dining Room Chairs


 
 
 
 
 

 

 

Replace Dining Room Tables


 

 

 

 

 

 

Grounds Improvement

         (Detention Pond Repairs)


 

 
 
 
 

 

 

 Replace Classroom Carpet


 

 
 

 

 

 

Security/CCTV Systems


What is a CCTV? Check it out HERE

 

 

 

 

 

HVAC System: Building


 

 

 
 

 

HVAC System: Building


 

 

 

 
 

 

 

HVAC System: Building


 

 
 

 

 

 

HVAC System: Building


 

 
 

 

 

 

 

HVAC System: Building


 

 
 

 

 

 

HVAC System: Building


 

 
 
 

 

Painting

(Hallways, Stairwells, and Common Areas)


 

3rd floor a building doors & frames 

 
 
 

3rd Floor A Building Doors & Walls

 
 
 

3rd Floor A Building Doors

 
 
 

3rd Floor A Building Entry Doors

 
 

3rd Floor A Building Doors & Frames

 
 
 

All Walls in Worship Center

 
 
 

Ceiling, Columns & Doors Grand Foyer

  

Ceiling, Columns & Doors Grand Foyer

 
 

Classroom E100

 
 

E Hall Loading Dock to Grand Foyer

 
 
 
 

E Hallway

 
 

Front Columns & Doors

 
 

Front  of Columns

 
 
 

Hallway to Brides Room

 
 

Loading Dock & Elevator Foyer

 

Loading Dock Door & Walls

 
 

Painting & Patching

 
 

Painting & Patching

 
 
 

Usher Room

 
 

Worship Center Vestibule

 
 
 

Worship Center Vestibule

 
 
 
 
 

 

 

Roof Repair

 


 

This is your opportunity to

 

BE A PART OF THE STORY!

 CLICK TO BE A PART OF THE STORY: